Joint Shoot: Rhinoworks (RW) & TMS Solutions
Wednesday, 21 October 2026, Sebenza. MoonDawg Media is videographer and editor; RW and TMS principals and staff are filmed as interview subjects and for supporting footage.
RW TMS Shared
Crew arrival: 09:45Wrap and pack-up: 15:00TMS: 42 Ingwe Road, Sebenza, EdenvaleRW: Sebenza, final address To confirm
Shoot-Day Schedule
Shared shoot-day schedule, Wednesday 21 October 2026
Time Activity Notes
09:45–10:00 Crew arrival
10:00–10:30 Setup
10:30 Drone shot Milestone RW thenTMS End time not specified.
10:45 Final checks Milestone End time not specified. Decide here if the drone is a no-go.
11:00–11:45 First interview: RW Principal RW
11:45–12:00 Gimbal B-roll Transition 11:45: interview ends, B-roll starts. RW thenTMS
12:00–12:30 Lunch Offload and back up morning footage.
12:30–13:15 Second interview: TMS Principal TMS
13:15–14:00 Employee vox pops Transition 13:15: interview ends, vox pops start. RW employees first, thenTMS employees
14:00–15:00 Gimbal and drone B-roll RW thenTMS Drone fallback window.
15:00 Wrap and pack-up
Times are fixed as briefed. Order within shared slots is RW then TMS; no split times have been set.
Videos Required (4 per company)
RW videos
1. “This Is Rhinoworks”: main corporate profile film (not a talking-head video)
2. Capability videos, one per capability: CNC routing, CO₂ & fibre laser cutting, press brake, plate rolling, perforation, fabrication
3. Material / technical specification, including what customers provide for a quote
4. “Where To Find Rhinoworks”: opens with drone; area, approach, landmarks, entrance, signage, access
TMS videos
1. “This Is TMS Solutions”: main corporate video, 2–3 min
2. Capability videos (length to be confirmed): aluminium cladding; architectural louvres; feature walls and architectural features; aluminium ceilings, fascias and soffits; design, CNC manufacturing and fabrication; completed projects
3. “What do we need to quote your project?”: 60–90 sec
4. “Where To Find Us: TMS Solutions”: 30–45 sec, opens with drone
Shoot Checklists
Setup (10:00–10:30)
Cameras, lenses, spare batteries, cards, tripod, gimbal, lighting, laptop and backup drives
Match frame rate, resolution, white balance, exposure and camera clocks; review test shots
Check power, light, background and noise at each interview position
Tell site contacts: drone 10:30, final checks 10:45, first interview 11:00
To confirm Site contact, parking and kit access, interview rooms
Drone (10:30; 14:00–15:00)
To confirm Pilot status, aviation permissions, airspace check, site-owner permission, insurance
Pre-flight: weather and wind, batteries, props, GPS lock, return-to-home height
Clear the flight area and brief staff; no flying over people or vehicles; keep drone in sight
If 10:30 is a no-go, decide at 10:45; fallback is 14:00–15:00, then ground-level gimbal exteriors
Log each flight
RW interview (11:00–11:45)
TMS interview (12:30–13:15)
Vox pops and consent (13:15–14:00)
RW coverage (B-roll and drone)
TMS coverage (B-roll and drone)
Drone: factory and surrounds, approach, landmarks, exterior, TMS branding, entrance, parking
Offices, team and design: reception, management, meetings, AutoCAD, technical drawings
Factory: CNC, materials, cutting, forming, fabrication, panel assembly, quality control
Products: cladding, louvres, feature walls, ceilings, fascias, soffits, windows and doors, finishes
Completed and current projects: wide, medium, detail, application and installation shots, plus photography
To confirm Where projects are filmed (on site or elsewhere)
B-roll, lunch, backup, pack-up
If Something Goes Wrong
Weather stops the drone Decide at 10:45. Fallback 14:00–15:00, then ground-level gimbal exteriors.
Noise in an interview Pause, ask whether machinery can stop, or move position. Log the take.
Overrun Tell the producer. The 11:45 and 13:15 transitions are fixed; decide what to shorten.
Interviewee unavailable Swap in the next planned activity and note the gap for a pick-up.
Equipment or power failure Switch to backup camera, audio or batteries; do not reuse a suspect card.
Consent withdrawn Stop filming that person and exclude their footage.
Reference Briefs (online only)
These PDFs need a connection. Open or save them before the shoot if the site has poor signal.
Items to Confirm
RW final address; site contacts, parking and access; interview rooms
RW and TMS principals: names, titles, release format
Vox pop participants, questions and consent format
Lunch arrangements and dietary needs; PPE; whether machinery can pause
Slot-by-slot allocation of coverage; TMS completed-project filming location
Footage destination, delivery dates and editing timeline